Veuillez utiliser cette adresse pour citer ce document : http://repository.enp.edu.dz/jspui/handle/123456789/11003
Titre: Integration of a relay protection GemStart 4.3 into a PLC
Auteur(s): Hessaine, Mohamed Akram
Rouabhia, Mohamed
Berkouk, El Madjid, Directeur de thèse
Houar, Adda, Directeur de thèse
Mots-clés: Protection
Electrical motor
Gemstart
PLC
Date de publication: 2024
Résumé: The obsolescence of Gemstart 4 controllers poses challenges for electrical systems due to production stoppages and limited technical support. Replacing these controllers with newer models is costly. An alternative is to integrate their protection relays directly into a PLC, making the system simpler and more flexible. This approach improves management, reduces maintenance costs and extends the life of the system, justifying the initial investment.
Description: Mémoire de Projet de Fin d’Études : Électrotechnique : Alger, École Nationale Polytechnique : 2024
URI/URL: http://repository.enp.edu.dz/jspui/handle/123456789/11003
Collection(s) :Département Electrotechnique

Fichier(s) constituant ce document :
Fichier Description TailleFormat 
HESSAINE.Mohamed.Akram_ROUABHIA.Mohamed.pdfPA017247.27 MBAdobe PDFVoir/Ouvrir


Tous les documents dans DSpace sont protégés par copyright, avec tous droits réservés.